AGM Presentation
Released
Released
Announcement PDF
ASX: CVV
Building Australia’s Next
Copper Company
Annual General Meeting 25 November 2024
Suite 1/245 Churchill Avenue, Subiaco WA 6008
1
Forward Looking and Cautionary Statements
Caravel Minerals Limited (Caravel or the Company)
This presentation should be considered in its entirety. If you do not understand
the material contained in this presentation, you should consult your professional
advisers.
The sole purpose of this presentation is to provide shareholders with an update
on current activities of the Company and the Caravel Copper Project. Any
statements which may be considered forward looking statements relate only to
the date of this presentation document. Such forward looking statements involve
known and unknown risks, uncertainties and other important factors beyond the
Company’s control that could cause actual results, performance or achievements
of the Company to be materially different from future results, performance, or
achievements expressed or implied by such forward looking statements. As a
result of these factors, the events described in the forward-looking statements in
this document may not occur.
Notwithstanding the material in this presentation, shareholders should consider
that any investment in the Company is highly speculative and should consult their
professional advisers – whether scientific, business, financial or legal – before
deciding whether to make any investment in the Company. The Company may at
its absolute discretion, but without being under any obligation to do so, update,
amend or supplement this presentation or any other information to the recipient.
No person has been authorised to give any information or make any
representation other than contained in this document and if given or made, such
information or representation must not be relied on as having been so
authorised.
Previous Disclosure
This document may include references to information that relates to Mineral
Resources prepared and first disclosed under the JORC Code 2012. The
information references the Company’s previous ASX announcements
•
•
12 July 2022 “Caravel Copper Project Pre-Feasibility Study
Highlights Robust, Executable Project and Reports Maiden
Ore Reserve”
20 September 2022 “Pre-Feasibility Study Update – Caravel
Copper Project”
•
•
•
13 April 2023 “PFS Processing Update – Caravel Copper
Project”
10 October 2023 " Drilling Results - Dasher and Bindi"
13 November 2023 "2023 Mineral Resource Update - Caravel
Copper Project"
These announcements are available to view on the Company’s website
www.caravelminerals.com.au. The Company confirms that it is not aware of any
new information or data that materially affects the information included in the
original market announcement and that all material assumptions and technical
parameters underpinning the relevant market announcement continue to apply
and have not materially changed. The Company confirms that the form and
context in which the Competent Person’s findings are represented have not been
materially modified from the original market announcement.
Competent Persons Statements
The information in this report that relates to Exploration Results is based on and
information compiled by Mr Peter Pring, a Competent Person who is a Member of
the Australasian Institute of Mining and Metallurgy. Mr Pring is a Senior Exploration
Geologist with and a full-time employee of Caravel Minerals. Mr Pring is a
shareholder of Caravel Minerals. Mr Pring has sufficient experience that is relevant
to the style of mineralisation and type of deposits under consideration, and to the
activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Pring
consents to the inclusion in this report of the matters based on his information in
the form and context in which it appears.
The information in this report that relates to Mineral Resources is based on
information compiled by Mr Lauritz Barnes, a Competent Person who is a member
of both the Australasian Institute of Mining and Metallurgy and the Australian
Institute of Geoscientists. Mr Barnes is a consultant to Caravel Minerals and is
employed by Trepanier Pty Ltd. Mr Barnes has sufficient experience that is relevant
to the style of mineralisation and type of deposit under consideration, and to the
activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Barnes
consents to the inclusion in this report of the matters based on his information in
the form and context in which it appears.
The information in this report that relates to Ore Reserves is based upon information
compiled by Mr Steve Craig, a Competent Person who is a Member of the
Australasian Institute of Mining and Metallurgy. Mr Craig is a consultant to Caravel
Minerals and is employed by Orelogy Consulting Pty Ltd. Mr Craig has sufficient
experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person
as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC)
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves. Mr Craig consents to the inclusion in this report of the matters based on
his information in the form and context in which it appears.
Forward Looking Statements
This document may include forward looking statements. Forward looking
statements include, but are not necessarily limited to, statements concerning
Caravel Minerals planned exploration programmes, studies and other statements
that are not historic facts. When used in this document, the words such as
“could”, “indicates”, “plan”, “estimate”, “expect”, “intend”, “may”, “potential”,
“should” and similar expressions are forward looking statements. Such
statements involve risks and uncertainties, and no assurances can be provided
that actual results or work completed will be consistent with these forwardlooking statements.
Authorisation of release
Release of this market announcement is authorised by Don Hyma, Caravel
Minerals Limited’s Managing Director.
2
Corporate snapshot
Ownership
Snapshot
ASX ticker
CVV
Share price (22 November 2024)
17.5c
Shares on issue
557M
Options on issue
43M
Market capitalisation (22 November 2024)
$97M
Cash (22 November 2024)
$9M
Enterprise Value
$88M
Debt
Twelve-month Share Price Performance
Paradice
9.4%
Board &
Management
8.1%
Glenvar
3.5%
Other holders
55.2%
Alma Metals
2.5%
Balance of Top
30
21.2%
Nil
Board
Management
Wayne Trumble – Chairman
Dan Davis – CFO and CoSec
Richard Monti – Non-Executive Director
Grant Harding – Metallurgy
Alasdair Cooke – Executive Director
Mick Klvac – Regulatory Approvals
Don Hyma – Managing Director
Bruce McLarty – Commercial and Land
Greg Lilleyman – Strategic Advisor
Chantal Hartstone – Corporate Affairs
Peter Pring – Geology and Exploration
3
2024 in Review
Steadily defining the key building blocks of the Caravel Copper project
Updated Mineral Resource Estimate (MRE)
Updated Mine Plan substantially complete
•
Incorporates in-fill drilling at Bindi and Dasher
•
•
MRE increased 8% from 1.181 to 1.276 billion tonnes
@ 0.24% Cu and 47ppm Mo, for 3,032,500t of
contained copper plus 60,600t of contained
molybdenum (at a 0.1% Cu cut-off grade)
Based on the latest resource estimate and current
market costs
•
Scheduled for delivery Q1 2025
•
A 48% increase in the higher confidence in Measured
Resource category, to 155Mt from 105Mt
•
First detailed assessment of the precious metals
within the resource, estimating 895,100oz of gold
and 46.3Moz of contained silver
4
2024 in Review
Steadily defining the key building blocks of the Caravel Copper project
Metallurgical testwork increased precious metal
recoveries
•
50-60% for both gold and silver (up from the previous
estimate of 30%)
•
Potential for additional revenue through precious metals
credits with no change to production costs
Finalising metal recovery and concentrate grades
•
Completion estimated early 2025 to feed into engineering,
study completion and customer offtake discussions
Tailings
•
A revised tailings management facility design is under
consideration to minimise cost, reduce environmental
impact, and increase operational safety
5
2024 in Review
Steadily defining the key building blocks of the Caravel Copper project
Permitting well-underway
•
Environmental Review Document (ERD) lodged with the Environmental Protection
Agency (EPA) of Western Australia
•
Public review and comment period anticipated in Q1 2025
De-risking site infrastructure requirements
•
Studies continue with the State power utility, Western Power leading to a grid access
offer mid 2025
•
Groundwater modelling complete with water licensing applications submitted and
under review
Securing access to land
•
A call option deed was signed to acquire 1,098 hectares covering the initial mining
areas within the main Bindi pit
•
A key land and water agreement was signed to secure access to groundwater
6
In 2024, the copper industry was reshaped by consolidation
Major producers are active in M&A
• Recent deals demonstrate the view majors have
on future value in the copper markets
• These industry participants understand the
constraints on future supply and are acting now
to secure future production
• Projects with significant scale (>50ktpa Cu) and
long life (+25 years) are in demand by major
mining houses, smelters and traders
7
Copper concentrate supply shortages set to intensify
Strong forward demand and fewer developments is tipping the industry to lower stocks and higher prices
Primary copper demand vs potential new supply
Shrinking supply inventory vs copper price
• Strong forward demand driven by EV production,
power turbines & electricity network modernisation
• Since 2016, inventory is trending lower as
concentrate supply growth is constrained
• Very little growth supply coming on-line is likely to
create a structure deficit in coming years
• In response, prices are trending higher to
incentivise new developments
8
Significant smelter expansion is further driving concentrate shortages
China still the main player but Indonesia and India growing fast
• Global copper smelting capacity is ~22Mtpa
• China dominates at ~9Mtpa and relies largely on imports
from seaborne trade
• Japan and South Korea have 7 smelters with a combined
capacity of 2.4Mtpa
• 1Mtpa of capacity is in the African copper belt
(DRC/Zambia) and a new smelter in Indonesia is adding
pressure to seaborne trade
• India has 0.5Mtpa of new capacity and will likely double
in the next few years.
• Collectively, this represents ~67% of global smelting
capacity
• Caravel is strategically located to provide concentrate
supply
Source: Company Research
9
Looking ahead
Finalising technical studies
• Mine plan to confirm mining rates, fleet size and
costs
• Final tailings management methods and costs
• Simplified and integrated site layout
• Metallurgical testwork and process flowsheet
• Definitive engineering study
10
Looking ahead
Securing key approvals and agreements in advance of FID
• Part IV environmental approval including a 5-week public
environmental review early 2025
• Water extraction licensing
• Access to grid power
• Remaining land agreements
Key milestones for 2025
• Government engagement – significant project to the State of WA
• Inaugural Sustainability Report – ESG credentials to support
financing
• Agreements with strategic partners / off-takers
• Feasibility Study completion
11
FOR MORE INFORMATION ASX:CVV
caravelminerals.com.au
Thank you
12
Share your feedback
Discover