Annual Report to shareholders
Released
Released
Announcement PDF
ANNUAL REPORT
2023
CVV
COPPER EXPLORATION AND DEVELOPMENT
CARAVE L
MINERALS
ANNUAL REPORT
2023
CONTENTS
caravelminerals.com.au
DIRECTORS
SECTION 01
WAYNE TRUMBLE
Non-Executive Chairman
HIGHLIGHTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 03
DON HYMA
Managing Director
SECTION 02
ALASDAIR COOKE
Executive Director
CHAIRMAN’S LETTER. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 05
SECTION 03
RICHARD MONTI
Non-Executive Director
MANAGING DIRECTOR’S REPORT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 06
COMPANY SECRETARY
SECTION 04
DANIEL DAVIS
Company Secretary
REGISTERED AND PRINCIPAL OFFICE
REVEIW OF OPERATIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 08
SECTION 05
REVIEW OF MINERAL RESOURCES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
CARAVEL MINERALS LIMITED
Suite 1, 245 Churchill Avenue
Subiaco Western Australia 6008
+61 8 9426 6400
SECTION 06
AUSTRALAIN BUSINESS NUMBER
ABN 41 120 069 089
SECTION 07
SHARE REGISTER
CORPORATE AND OUTLOOK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
DIRECTOR’S REPORT 30 JUNE 2023 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
INDEPENDENT AUDITOR’S DECLARATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
ATOMIC GROUP
Level 2 267 St Georges Terrace
Perth Western Australia 6000
CONSOLIDATED STATEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
ASX CODE
DIRECTORS’ DECLARATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
CVV
Australian Securities Exchange Limited
Fully Paid Ordinary Shares
INDEPENDENT AUDITOR’S REPORT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
SOLICITORS
FAIRWEATHER CORPORATE LAWYERS
595 Stirling Highway
Cottesloe Western Australia 6011
AUDITORS
BDO AUDIT (WA) PTY LTD
38 Station Street
Subiaco Western Australia 6008
SECTION 08
ADDITIONAL INFORMATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
ASX:CVV
1
2
CARAVE L
MINERALS
ANNUAL REPORT
2023
HIGHLIGHTS 2022 – 2023 IN REVIEW
SECTION 01
CARAVEL
COPPER
PROJECT
• Substantial progress with study and pre-development
activities, building on the 2022 Prefeasibility Study
(PFS) and Maiden Ore Reserve.
• Positive independent reviews of ore reserves and
metallurgical process design.
• Project value was significantly increased by
simplification of the process plant design and an
incremental nameplate capacity increase.
• Introduction of a Molybdenum Recovery Circuit (MRC)
to produce a separate marketable by-product.
• Perth-based Lycopodium Minerals Pty Ltd selected as
lead engineer for the Bankable Feasibility Study (BFS).
• Benchmarking visits undertaken to major Canadian
copper mines of similar grade and scale which
validated Caravel’s design plans.
• Groundwater drilling and modelling confirmed the
presence of a newly discovered brackish aquifer.
caravelminerals.com.au
ASX:CVV
• Applications for water abstraction licenses lodged,
in parallel with stakeholder engagement to secure
an infrastructure corridor for the borefield
and water pipeline.
• Application submitted to Western Power for
connection to the existing energy transmission
network (SWIS) to support a low-cost power solution.
• Financing proposals received from several mining
equipment manufacturers which are progressing
towards partnering arrangements for an automated
and electrified mining fleet.
• Key mining tenure approvals received for the Dasher
resource area, with Mining Lease 70/1411 and General
Purpose Lease 70/623 granted by the Department
of Mines, Industry, Regulation and Safety (DMIRS).
Heritage surveys for these areas were completed
by the Yued Aboriginal Group.
• Project referrals submitted under the Environmental
Protection Act 1986 (State) and the Environmental
Protection and Biodiversity Conservation Act 1999
(Commonwealth) to formally commence the primary
environmental assessment for the Project.
• Final environmental studies required for State
and Commonwealth environmental approvals nearing
completion. The State Government has set the level of
assessment for the Project as a Public Environmental
Review, giving certainty to the approval process.
• Completed two strongly supported capital raising and
a Share Purchase Plan (SPP), raising A$21.5m
• The raising proceeds will underpin work on the
Bankable Feasibility Study (BFS), permitting and
infrastructure studies and other development
activities. Caravel had a cash balance of $13.7 million
at 30 June 2023.
Our vision: to create value for our
stakeholders through the development
of a modern copper project.
3
4
ANNUAL REPORT
2023
CHAIRMAN’S LETTER
SECTION 02
caravelminerals.com.au
ASX:CVV
the Caravel Copper
Project is a unique
opportunity in
the global copper
landscape...
Wayne Trumble
CHAIRMAN
Dear Fellow Shareholders,
On behalf of the Board of Directors, it is my pleasure
to introduce the 2023 Annual Report for Caravel Minerals
and take this opportunity to thank all shareholders for
your continued support of the Company.
The progress we are reporting this year has been made
at a time of changing conditions in equity markets,
notwithstanding the broader thematic for copper as the
cornerstone metal of global decarbonisation.
As our shareholders understand, the Caravel Copper
Project represents a unique opportunity in the global
copper landscape. It is a large, long-life Project which
generates strong financial returns and competitive
operating cost metrics. Low costs are made possible
using well-established and proven bulk mining and
processing methods.
A wide range of credible industry participants, global
investment banks and financial analysts are forecasting
an emerging structural supply deficit in copper
towards 2030 as surging demand meets an increasingly
challenged supply pipeline. Global investment banks
and mining companies such as BHP and Glencore,
are predicting global copper shortages as the pace
to decarbonise quickens. This all augurs very well for
the methodical and considered progression of the
Caravel Copper Project through development towards
production later this decade.
Following the Project Pre-Feasibility Study (PFS)
Release in July 2022, the team has achieved important
improvements to the Project’s value and economics
resulting from simplification of the processing plant
design and the inclusion of a Molybdenum Recovery
Circuit. This year also saw the completion of extensive
field-based programs with the valued involvement of
landowners and Traditional Owners in the region. We
have also continued discussions with a range of key
Project stakeholders including the State, Government
Agencies, Shires and industry participants as we
continue to secure the Project’s power and water
infrastructure.
I also want to highlight Caravel’s commitment to health,
safety and engagement which resulted in no lost time
injuries this year. This result starts with ensuring
the safety and wellbeing of our hard-working staff,
contractors and community, whom I sincerely thank
for their ongoing efforts and involvement.
In conclusion and on behalf of the Board, I wish to thank
you, our shareholders, for your ongoing support. This
year is shaping as another defining one as we continue
final feasibility studies for the Caravel Copper Project.
I look forward to updating you further
at our Annual General Meeting.
Wayne
Trumble
Wayne Trumble
CHAIRMAN
5
ANNUAL REPORT
6
2023
MANAGING DIRECTOR’S REPORT
SECTION 03
caravelminerals.com.au
ASX:CVV
this year has been
one of significant
progress...
Don Hyma
MANAGING DIRECTOR
After two years as an advisor to the Caravel Board,
it is a great pleasure to present my first Managing
Director’s report on behalf of the Company and the
Caravel Copper Project.
The past year saw Caravel take important steps towards
our goal of developing a new long-life copper project
in Western Australia’s Wheatbelt region. As well as
advancing a host of key studies and pre-development
activities, we refined the Pre-Feasibility Study to
capture upside value by simplifying the design of the
process plant, increasing its’ scale, and adding a small
circuit to produce Molybdenum as a by-product.
Our approach is characterised by a commitment to
carefully analyse and de-risk all elements of the Project
prior to a financial investment decision. We have been
systematic and methodical in our approach to power
and water, land access, stakeholder engagement,
flowsheet design and mine planning, including
benchmarking against similar operations offshore and
engaging early with equipment manufacturers, design
firms and constructors.
The Project is a highly attractive opportunity given
its’ multi-decade mine life, favourable location proximal
to Perth, low operating cost achieved through simple
bulk mining methods, and is therefore well-positioned
to capture the forecast copper supply deficit emerging
toward the end of this decade.
A key achievement during the year was the completion
of an independent metallurgical process review by
Lycopodium Limited, which confirmed the absence of
any fatal flaws in the process testwork, equipment
selection and basic plant design. This result provides
confidence that the plant has been designed to the
optimum scale and will perform as intended.
We had the opportunity to visit Gibraltar Mines and
Copper Mountain Mining in Canada. These operations
have similar ore grades and production levels to
Caravel, and therefore represent excellent benchmark
operations that have been performing successfully for
decades. The visits validated the Project’s adoption of
modern mining technologies including electrification
and automation and allowed direct assessments
of comminution, grinding, flotation and ore sorting
technologies.
During the year, we made substantial progress toward
securing a sustainable water supply for the Project.
We have also progressed studies with Western
Power with the aim of securing a low-cost grid power
solution for the Project. Important environmental and
heritage studies continued including engagement with
landowners and Traditional Owner Groups.
The Project’s location only 150km north of Perth
offers numerous advantages from a development
perspective. Being in a Tier-1 jurisdiction for mining
investment, with a well-established regulatory and
permitting framework, adjacent to high-quality
available infrastructure, and supported by a skilled
construction and operations workforce makes this
Project highly attractive. Importantly, this is a Project
which is well-timed to generate economic benefits
for shareholders and the regional economy as copper
demand is forecast to grow and the supply gap widens.
Caravel offers excellent exposure to copper in what
is a limited group of companies with prospects of
development in the next few years. Our Project has
great upside to the copper price, with every US$0.50/lb
copper price increase generating an additional US$0.9B
in pre-tax NPV, from a base case NPV of US$2B at
US$4.00/lb copper.
Given equity market conditions being experienced
currently, the Board is cognisant of managing our
finances prudently and ensuring we make the most of
our cash resources. With that in mind, we are adopting
a cautious and staged approach to initiating major
expenditure items, such as commencing detailed
engineering work with our selected EPCM firm,
Lycopodium Limited. Essential work is continuing
in metallurgy, environmental approvals, water and
power access, stakeholder engagement and strategic
partnering.
Our copper project will be one of the largest single new
investments in the Wheatbelt region’s history and we
are taking the time and methodical approach to get it
right. Balancing technical accuracy considerations and
current market conditions, the team has developed
what we describe as a “long runway” approach to
studying and developing the Project. We believe this
is prudent and sensible in the current environment and
will serve us well for the future as we work toward a
financial investment decision.
In conclusion, I would like to extend my sincere thanks
to the small but highly experienced Caravel team. Their
hard work, dedication and focus is greatly appreciated.
My thanks also to you as shareholders for your support
including investors who participated in our capital
raising during the year.
We have an exciting year ahead of us as we continue to
de-risk the Project. I look forward to continuing to share
our progress with you.
Don
Hyma
Don Hyma
MANAGING DIRECTOR
7
ANNUAL REPORT
8
2023
REVIEW OF OPERATIONS
SECTION 04
caravelminerals.com.au
CARAVEL PROJECT OVERVIEW
INDEPENDENT PROCESS REVIEW
PROCESS FLOWSHEET
Caravel Minerals Limited (“Caravel” or “Company”) is an
advanced stage exploration and minerals development
company focussed on bringing its’ flagship copper project
in Western Australia into production to meet the forecast
growth in global metals demand needed to achieve
progressive decarbonisation targets by 2030 and 2050.
On 13 April 2023, Caravel reported the outcomes of
an independent metallurgical process review for the
Caravel Copper Project, which identified substantial
opportunities to enhance Project value and confirmed
the suitability of the process flowsheet ahead of the
start of engineering for the Bankable Feasibility Study
(BFS). The three-month review was undertaken by
industry specialist engineering and project delivery firm
Lycopodium Minerals (Lycopodium) and Orway Mineral
Consultants (OMC).
Figure 1: Including a Molybdenum Recovery Circuit
to produce separate Mo and Cu concentrate products.
The Company has a strong technical, project
implementation and operational team to progress
through the Bankable Feasibility Study (“BFS”) phase
towards operations in the latter half of the decade.
The Company aims to maximise shareholder value
through a well-considered approach to studies, careful
fiscal management, safe and responsible field activities
that minimise disruption and environmental impact,
and de-risking the Project prior to implementation.
Caravel Minerals’ Copper Project is located 150km
north-east of Perth in Western Australia’s Wheatbelt
region, which has established road, power and
supporting town infrastructure and services.
...the company
aims to maximise
shareholder value
The Project deposits are planned to be mined by
conventional open-pit, low-cost, bulk mining methods
using automated and electrified equipment and
technologies. Processing will be by an industry-proven
conventional copper processing plant to produce
a high-quality concentrate product. The Project is
planned to operate for 25+ years producing ~65,000
tonnes of copper-in-concentrate per annum (~71,000 tpa
in the first five years) and ~900 tonnes of molybdenumin-concentrate per annum. Concentrate is planned to
be transported, by truck, using existing sealed roads to
Bunbury or Geraldton Port for export.
Caravel’s copper deposits form part of a 30km long
regional porphyry-style copper-molybdenum-gold
mineralised belt. Discovered in the mid-2000’s in a
previously unexplored part of the South-West Yilgarn
Terrane. This region also hosts some of Australia’s most
significant mineral discoveries including Greenbushes
Li, Boddington Au-Cu and Chalice Julimar PGE.
Australia’s largest undeveloped copper Project, Caravel
is based on the JORC Code 2012 Mineral Resource
estimate reported in November 2021, totalling 1.18
billion tonnes @ 0.24% Cu for 2.84Mt of contained
copper (using 0.1% Cu cut-off).
Primary/Secondary Crushing
The key outcomes of the review included an incremental
increase in process plant capacity of ~10% to 30 Mtpa,
the inclusion of a Molybdenum Recovery Circuit (MRC),
the deferral of the Coarse Particle Flotation (CPF) circuit
and an update to the overall process plant copper
recovery. Based on these changes, forecast annual
copper production increases from 60ktpa to 65ktpa at
steady state, supplemented by 0.9ktpa of molybdenum
production as saleable by-product.
The adopted changes have all demonstrated material
benefits to the Project and are now incorporated into
the base case process plant design and financial model
for the BFS.
Ore Storage
HPGRs and Ball Mills
Cleaner Flotation
Regrind Mills
Rougher Flotation
Mo/Cu Separation
Tailings Storage
H₂O Recycle to Process
PROCESSING PLANT
Figure 2 : Under Feasibility Study Development –
3D diagram of the Caravel Copper Project Process
Plant layout.
Mo Concentrate
Cu Concentrate
Cleaner
Flotation Circuit
Secondary
Crusher Building
ROM
Pad
Primary
Crusher
High Pressure
Grinding Roll Building
Coarse Ore
Stockpile
Screen
Building
Ball
Mills
Concentrate
Regrind Mill
Concentrate Dewatering
and Loadout
Rougher
Flotation Circuit
Warehouse
and Workshops
Concentrate
Thickener
Molybdenum
Circuit
Tailings
Thickener
ASX:CVV
9
ANNUAL REPORT
10
2023
Collectively, the adopted changes are forecast to:
WATER
• Increase annual copper production from 60ktpa
to 65ktpa (71ktpa in the first five years)
A water bore drilling program has been completed at
the proposed borefield ~60km west of the project site.
16 bores have been drilled, developed, and tested over
the past 18 months. Global Groundwater is developing a
numerical groundwater model using the geological and
water data collected from the borefield.
• Increase initial capital investment from A$1.6B to A$1.7B
• Reduce C1 costs from US$1.54/lb to US$1.23/lb
• Reduce AISC from US$2.37/lb to US$2.07/lb
• Increase pre-tax net cash flow from A$5.6B to A$6.6B
• Increase pre-tax NPV7 from A$1.5B to A$2.0B
• Increase pre-tax IRR from 18% to 21%
• Reduce the Project payback period from 5.6 years
to 4.9 years.
The PFS Processing Update outcomes are based on
changes to the comminution and flotation circuits
within the process plant. All other study areas,
including Ore Reserves, Mineral Resources, mining
method, infrastructure studies reported in the July 2022
PFS remained unchanged.
The material assumptions in respect of the PFS financial
forecasts and production targets continue to apply with
no material change to these assumptions.
Following completion of the review, the base case
process flowsheet for the BFS has been established.
A schematic diagram of the process flowsheet is
illustrated in Figures 1 and 2.
LYCOPODIUM APPOINTED AS LEAD ENGINEER
Caravel appointed Perth-based Lycopodium Minerals
Pty Ltd as lead engineer for the BFS. Lycopodium has
extensive experience in mineral processing plant
design and project management, including copper
processing projects at Sandfire’s Motheo Copper Project
(Botswana) and First Quantum’s Cobre Panama Project
(Central America). Lycopodium is a highly experienced
engineering and project management firm and a strategic
execution partner for Caravel, with an extensive West
Australian pedigree in mineral processing, large capital
project delivery, firsthand knowledge of local fabricators,
constructors, regulatory processes, and long-standing
business relationships in the resources sector.
In conjunction with Caravel, Lycopodium will be
responsible for the Engineering, Procurement and
Construction Management (EPCM) delivery of the
Caravel Copper Project, including engaging with
numerous technical advisors and specialist consultants
in resource modelling, mine planning, metallurgical
testing, environmental and regulatory approvals, and
technology development. The BFS is expected to take
approximately twelve months to complete.
BANKABLE FEASIBILITY STUDY (BFS)
Caravel Minerals has progressed key workstreams that
will enable the completion of a high-quality BFS for the
Caravel Copper Project, with key work programs during
FY2023 including:
The numerical groundwater model is expected to
quantify the details outlined in the conceptual water
model developed and shared with the Department
of Water and Environmental Regulation (DWER)
earlier this year. The model identifies the existence
of a new aquifer with capacity to support the Project
water requirements. Applications for abstraction
licenses are being assessed by DWER. Negotiations
with key landowners are well-advanced to enable the
development and operation of the borefield.
Advisian Consultants are progressing groundwater
modelling for the mine project area. This includes water
bore monitoring to provide baseline data and passive
seismic surveys to provide definition of the paleo
drainage systems. In addition, two deep production
bores were installed into a water-bearing structure
along the western side of the Bindi Deposit. Pump
testing will provide data to understand the capacity
of the fractured rock aquifer and pit dewatering
requirements which are expected to be minimal.
POWER
Caravel is working closely with Western Power to
access transmission grid capacity for the Project. The
Access Application submitted to Western Power has
been approved and the first phase of studies (Steady
State Studies) have been completed. Additional studies
are underway in anticipation of an Access Offer from
Western Power in Q3 2024. Caravel is completing
a power demand simulation study to assess the
opportunity to manage intra-day power demand in
relationship to pricing cycles. Discussions with energy
suppliers have commenced.
APPROVALS
Mining Lease 70/1411 and General Purpose Lease 70/263
were granted by WA’s Department of Mines, Industry,
Regulation and Safety (DMIRS) on 21 September 2022
and 6 October 2022 respectively. Both leases are valid
for an initial term of 21 years.
M70/1411 covers the Dasher Deposit and associated
waste rock landform and crushing infrastructure. This
provides Mining Act 1978 tenure to fully develop and mine
the Dasher resource. G70/263 covers some supporting
infrastructure for the Dasher and Bindi deposits. This
lease provides Mining Act 1978 tenure for the construction
of waste rock landforms, tailings management facilities
and other associated mining infrastructure to support the
mining of the Dasher resource.
REVIEW OF OPERATIONS
SECTION 04
Standard conditions apply to both grants including
the requirement to submit a Mining Proposal to DMIRS
prior to commencing mining activities. MLA/1410
and GPLA/262 covering the Bindi resource and
associated infrastructure remain in progress as
applications with DMIRS.
Archaeological and ethnographic surveys have been
completed with representatives from the Yued
Aboriginal Group. The surveys have cleared the areas
within M70/1411 and GPL70/263 for development. Caravel
continues to work with the Yued People to ensure
ongoing management of any identified heritage values
associated with the Project.
Final environmental studies required for the State and
Federal environmental approvals are nearing completion.
The process to obtain primary Project environmental
approvals under the State Environmental Protection
Act 1986 (Part IV) and Commonwealth Environmental
Protection and Biodiversity Conservation Act 1999
(Matters of National Environmental Significance)
has commenced. The level of assessment has been set
at Public Environmental Review and the scope of the
assessment has been drafted and is being assessed by
the Department of Water and Environmental Regulation
(DWER) and the Department of Climate Change, Energy,
the Environment and Water (DCCEEW).
Caravel is currently preparing the Environmental
Review Document, which will be the subject of the
Accredited Assessment by the State and Federal
Governments and a public comment period during
2024. Consultation with environmental and other
stakeholders has occurred during the year and will
continue over the life of the project.
MINING EQUIPMENT
Discussions have progressed with mining equipment
manufacturers as Caravel works towards identification
of preferred suppliers of the automated and electrified
mining fleet. Fleet financing proposals from several
vendors have been received as progress is made
towards preliminary commercial arrangements. The
mining equipment sourcing is consistent with forecast
delivery timeframes and is in readiness to undertake
pre-development activity and potentially secure ~20%
of the project’s capital requirements.
DASHER DRILLING
Drilling was completed at Dasher to establish design
parameters required for open pit mine design,
establish a cost-effective general arrangement
of the process plant and supporting non-process
infrastructure, and to collect samples for continuous
metallurgical testing for engineering design. The drilling
program was completed in Q3 2023.
caravelminerals.com.au
ASX:CVV
BENCHMARKING SITE VISITS
Members of the Caravel management team visited the
Gibraltar Mine (Taseko) and Copper Mountain Mine
(Hudbay) in May 2023. Both operations have a head
grade of 0.25% copper, low strip ratio, and throughputs
of 30Mtpa and 16Mtpa respectively; Gibraltar mine
has a Molybdenum circuit. The mine visits enabled
benchmarking Caravel’s project against the operations
regarding comminution, grinding, flotation, mine
electrification, and ore sorting technology. The visit
confirmed many engineering and design decisions to be
studied in the BFS.
...mine visits
enabled us to
benchmark
Caravel’s project
PROJECT FUNDING
Caravel Minerals is pursuing a range of options for
funding the Caravel Copper Project development.
Strategic partnering: Producing >60ktpa of clean
copper concentrate in an attractive investment
destination like WA makes Caravel of interest to
major copper smelters and traders seeking long term
concentrate supply agreements. These types of supply
agreements commonly involve equity and debt financing
arrangements.
Joint-venture partnering: The Caravel Project is one
of very few projects globally with both significant
scale and location in a good investment jurisdiction.
This makes it attractive to mid-tier mining companies
seeking near term copper production opportunities.
Vendor financing options: The Project’s close location to
Perth-based vendors offers opportunities for different
funding models, such as service and performancebased contracts for certain mobile or replaceable
equipment. Current expectations are that the mining
fleet will be largely vendor financed, and Caravel is
investigating vendor financing models for significant
components of the process plant. These options will
reduce the project financing requirement and, where
performance based, will reduce operating risks.
Caravel continued exploration and project development
work programs and activities in line with its Health,
Safety, Environment, Community and Quality
Management System (HSECQ). Caravel’s HSECQ business
system was developed and implemented in mid-2021
to build value for the business and its’ stakeholders by
undertaking all work safely and responsibly.
11
12
ANNUAL REPORT
2023
REVIEW OF OPERATIONS
SECTION 04
During 2023, Caravel Minerals began the journey
to formalise its ESG approach and alignment with
internationally recognised frameworks and standards. We
are investigating aligning our ESG reporting with the Global
Reporting Initiative (GRI) standards, enhancing reporting of
business activities to a wider range of stakeholders.
SAFETY
Caravel continues to implement its Health, Safety,
Environment, Community and Quality Management
System. The focus to date has been on identifying risks
in our field operations (exploration and investigative
works) and implementing preventative controls to
minimise the likelihood of incidents and implementing
mitigating controls. There were no lost time injuries
during FY2023.
STAKEHOLDER ENGAGEMENT
Caravel continued wide-ranging discussions with
landowners and other stakeholders regarding the
Project’s feasibility studies and the potential timeline
for implementation which remains subject to further
consultation and final approvals.
To support development of a buried water pipeline to
supply the Project with industrial quality processing
water, a conceptual underground water pipeline route
has been identified with the assistance and involvement
of landowners. The conceptual route is now being further
studied to include engineering, geotechnical, landowner
preferences, environmental and other factors.
Figure 4: Information update field session with community
members and landowners (April 2023)
Figure 5: Archaeological dig survey undertaken by representatives
of the Yued Aboriginal Group and supervised by archaeologists.
Figure 3: Conceptual pipeline route consultation with landowners
(May 2023).
caravelminerals.com.au
ASX:CVV
The information update described previous work
undertaken by the Department of Primary Industries
and Regional Development (DPIRD) and others in
the mid-2010s, which Caravel has further developed.
Consultation and engagement with interested
stakeholders is ongoing.
13
14
ANNUAL REPORT
CASE STUDY
2023
2022
ENVIRONMENT FOCUS
Caravel has successfully trialled a “solids recovery
unit” (SRU) during diamond core drilling programs
at the Dasher Deposit. The SRU separates drill
cuttings from the water returned from the hole,
the water is reused in the hole and the drill
cuttings are removed from site. The SRU requires
no drill sumps resulting in less impact on the soil
profile which is a major concern for landowners.
In addition, the SRU requires less water, reduces
the quantity of drilling muds used and allows
faster rehabilitation of drill sites.
CASE STUDY
REVIEW OF OPERATIONS
SECTION 04
DRILLING PROGRAMS
BINDI DIAMOND DRILLING
Diamond drilling at the Bindi deposit during the
reporting period increased confidence to the
existing Resource model, confirmed an extension of
mi