DIRECTORS
WAYNE TRUMBLE
Non-Executive Chairman
DON HYMA
Managing Director
ALASDAIR COOKE
Executive Director
RICHARD MONTI
Non-Executive Director
GREG LILLEYMAN
Strategic Advisor to the Board
COMPANY SECRETARY
DANIEL DAVIS
Company Secretary
REGISTERED AND PRINCIPAL OFFICE
CARAVEL MINERALS LIMITED
Suite 1, 245 Churchill Avenue
Subiaco Western Australia 6008
+61 8 9426 6400
AUSTRALIAN BUSINESS NUMBER
ABN 41 120 069 089
SHARE REGISTER
ATOMIC GROUP
Level 2 267 St Georges Terrace
Perth Western Australia 6000
1300 288 664
ASX CODE
CVV
Australian Securities Exchange Limited
Fully Paid Ordinary Shares
SOLICITORS
FAIRWEATHER CORPORATE LAWYERS
595 Stirling Highway
Cottesloe Western Australia 6011
AUDITORS
BDO AUDIT PTY LTD
Level 9, Mia Yellagonga Tower 2
5 Spring Street Perth, WA 6000
CARAVEL MINERALS
CONTENTS
ASX:CVV
Managing Director's Report
1
Operations' Report
4
Corporate Update
11
Annual Review of Mineral Resources
13
Tenement Schedule
15
Annual Financial Report
16
Additional Shareholder Information
53
CARAVE L
I am pleased to present my report for the 2024
financial year and to reflect on our continued
progress towards the establishment of
Australia’s next significant copper producer,
through the development of our flagship
Caravel Copper Project in Western Australia’s
Wheatbelt region.
We have said for some time that Caravel is a
project that must and will be built to meet
surging global demand for copper over the
coming decades – because of its Tier-1 location,
because of its scale and long life, and because
of its strong economics and fundamentals.
After observing the significant developments
that occurred in the copper industry during the
year, we feel more confident than ever that
Caravel’s time has well and truly come as the
push to decarbonise the global economy
gathers momentum and demand for copper – a
metal that is essential to electrification in all its
forms – rises to the next level.
COPPER MARKET
The copper price reached a new all-time high of
US$5.20/lb during the year, reflecting a growing
realisation by traders and investors that the
copper market is rapidly approaching an
expected structural deficit by the middle of this
decade.
The global copper industry is in the midst of a
historic transition; the average copper grade
mined by major producers has fallen from 1.2%
to 0.7% over the past decade and, despite
billions being invested in exploration, the rate of
greenfields discoveries have fallen well behind
where it needs to be.
ASX
CVV
1
caravelminerals.com.au
than those we have seen previously but,
because of their large scale and low costs,
capable of generating attractive margins
throughout the commodity price cycle.
Against this backdrop, the past 12 months has
seen accelerating consolidation and M&A
activity in the copper space as the world’s big
resource companies have sought to increase
their exposure to existing and new copper
production and development assets.
While this has yet to translate into improved
investor sentiment in the junior copper sector
on the ASX, we believe it is only a matter of time
before this will occur.
With ownership of the largest, most advanced
independent copper project outside of the midtier or major resource companies, Caravel
Minerals remains ideally positioned to benefit
from this compelling market outlook –
occupying an extremely competitive position at
the forefront of the new generation of global
copper development assets.
YEAR IN REVIEW
We continued to diligently and systematically
de-risk and advance the Caravel Copper Project
during the year, advancing key mining and
engineering studies and progressing project
approvals as part of an overarching Definitive
Feasibility Study for the project development.
At the same time, demand is forecast to remain
strong, driven by copper’s pivotal role in
electrical transmission, wind turbine power
generation and battery storage infrastructure
projects aimed at meeting decarbonisation
targets.
In November 2023, the Company announced an
updated Mineral Resource Estimate (MRE) for
the Caravel Project, incorporating results from
in-fill and Resource definition drilling at the
Bindi and Dasher deposits over the preceding
two years. The updated Mineral Resource totals
1.276 billion tonnes @ 0.24% Cu, 47ppm Mo,
22ppb Au and 1.1ppm Ag for 3,032,500t of
contained copper, 60,600t of contained
molybdenum, 895,100oz of contained gold and
46.3Moz of contained silver (at a 0.1% Cu cutoff).
When measuring primary copper demand
against potential new supply, a supply gap of up
to 10Mtpa is forecast to open up by 2035 –
requiring the development of a new generation
of copper projects which will be lower grade
This update included significant growth in the
higher confidence Measured Resource
category, which rose by 48% to 155Mt,
increasing the proportion of the Resource
available for conversion to Ore Reserves.
2024 ANNUAL REPORT
MANAGING DIRECTOR'S REPORT
In addition, the update also provided the first
detailed assessment of the precious metals
within the Project’s orebodies, estimating
895,100oz of contained gold and 46.3Moz of
contained silver. Metallurgical testwork
undertaken during the year showed a strong
increase in precious metal recoveries, ranging
between 50-60% for both gold and silver (up
from the previous estimate of 30%). This has the
potential to deliver material additional revenue
for the Caravel Project through precious metals
credits, with the higher recoveries able to be
achieved with no change to production costs.
Further metallurgical testing to optimise metal
recovery and concentrate grades is now nearing
completion to support final engineering studies
and process flow sheet design, with an updated
mine plan based on the latest resource also
well advanced and scheduled for delivery in
December 2024.
To support our ongoing mine planning, during
the year we were pleased to secure the services
of Greg Lilleyman as a Strategic Advisor to the
Board. Greg has over 30 years’ international
experience in the mining sector and has played
a pioneering role in the development and
implementation of next-generation bulk mining
technologies. His strong technical knowledge
and experience has already been invaluable to
Caravel as we continue our transition from
exploration into mine development and
operations.
On the permitting front, the Company achieved
a significant milestone late in the reporting
period with the Environmental Review
Document (ERD) for the Caravel Project lodged
with the Environmental Protection Agency (EPA)
of Western Australia in May. The submission of
this document represented the culmination of
four years of fieldwork, studies, scientific
modelling and reporting to produce a
comprehensive approval document, which will
now be made available for public review and
comment.
Positive progress has been made towards
finalising site infrastructure requirements, with
ground water modelling complete and water
licensing applications well advanced, and
SECTION 01
studies continue with the State power utility,
Western Power, to secure a grid connection.
A revised tailings management facility design is
under consideration to minimise cost, reduce
environmental impact, and increase
operational safety.
To de-risk our land access, Caravel has recently
entered into a binding Call Option Deed to
acquire 1,098 hectares of freehold land that
covers the planned initial mining areas,
including the main Bindi pit. The agreement,
which has been secured with landowner
Lawson Grains Pty Ltd, sets out the terms and
conditions for the land purchase within three
years, with a mechanism to extend the option
period if required, providing further certainty to
the Project’s development pathway.
Discussions are now ongoing with other parties
regarding the Project’s broader land
requirements.
Throughout the year, the Company’s work
programs have been conducted with an
unwavering focus on sustainable, socially
responsible development. Caravel’s approach
to Environmental, Social and Governance (ESG)
responsibilities is aligned with internationally
recognised frameworks and standards including
The Equator Principles, which will support
longer-term project financing requirements,
with our future ESG reporting to be conducted
in line with the Global Reporting Initiative (GRI)
standards.
One of the key initial sustainability programs we
are pursuing is the potential to work with local
landholders to help rehabilitate land affected by
rising groundwater and surface salinity.
Concept discussions have been held with
stakeholders and we look forward to
progressing this opportunity in the future.
ASX
CVV
2
CARAVE L
CORPORATE & OUTLOOK
Caravel completed a successful $10 million
capital raising early in the reporting period and
ended FY2024 with cash reserves of $8.7 million
and no debt.
We look forward to progressing key
workstreams in the year ahead, including:
• An update to the mine plan to increase
value and confirm mining rates, fleet size
and costs;
• An update to the process and tailings design
and the delivery of a simplified site layout;
• Progression of environmental approvals and
water license applications;
• Power access applications and
confirmation of Critical Project Status for
Caravel;
• Progression of negotiations for additional
land purchases;
• Continued stakeholder engagement; and
• Progression of discussions with potential
strategic partners and off-takers.
Looking to the year ahead, we are now very
close to completing the updated design
configuration for the Project, which will feed
into updated production, capital and operating
cost estimates and an updated development
timeline.
In closing, it’s an exciting to time to be
progressing a long-life copper project in such a
favourable location. The Caravel Copper Project
is on a clear pathway to development, with
strong technical fundamentals, robust
economics and permitting on track.
We are also continuing to engage with potential
strategic investors and project development
partners who have a shared interest in the
development of the Caravel Copper Project,
including groups with expertise and capability in
financing, mining operations, mining fleet and
process plant equipment, and export credit
agencies.
I would like to sincerely thank the entire Caravel
team – including our employees, contractors
and my fellow board members – for their hard
work and perseverance over the past year and
would also like to thank all our shareholders for
your continued support.
In light of the continued uncertainty in the
global macroeconomic environment – which
has had a significant impact on the ability of
junior mining companies to raise capital – we
maintained a responsible and prudent
approach to the management of our cash
reserves during the year, undertaking targeted
studies to simplify the Project design while
continuing to advance critical path activities,
primarily with respect to power, water and
environmental permitting.
These groups include the Export and Investment
Fund of Denmark (EIFO), the Danish Export
Credit Agency (ECA), who provided a Letter of
Intent to Caravel in October 2023 confirming
their interest in providing equipment finance
and potential project finance for the Caravel
Project development.
ASX
CVV
3
caravelminerals.com.au
We look forward to an exciting year ahead.
Don Hyma
Managing Director
2024 ANNUAL REPORT
OPERATION'S REPORT
SECTION 02
OPERATIONS REPORT
Caravel Minerals Limited (“Caravel” or “Company”) is an advanced stage exploration and minerals
development company focused on bringing its flagship 100%-owned copper project in Western
Australia into production to meet the forecast growth in global metals demand needed to achieve
progressive decarbonisation targets by 2030 and 2050 (Figure 1).
The Company has a strong technical, project implementation and operational team to progress
through the Bankable Feasibility Study (“BFS”) phase towards operations in the latter half of the
decade.
The Company aims to maximise shareholder value through a well-considered approach to studies,
careful fiscal management, safe and responsible field activities that minimise disruption and
environmental impact, and de-risking the Project prior to implementation.
Figure 1. Simplified interpreted geology of the Caravel Copper Project area showing the Wongan Batholith
and mineralised drill holes
ASX
CVV
4
CARAVE L
caravelminerals.com.au
Caravel Minerals’ “Caravel Copper Project” is located 150km north-east of Perth in Western Australia’s
Wheatbelt region, which has established road, power and supporting town infrastructure and
services.
The Project deposits are planned to be mined by conventional open-pit, low-cost, bulk mining
methods using automated and electrified equipment and technologies. Processing will be undertaken
using an industry-proven conventional copper processing plant to produce a high-quality concentrate
product. The Project is planned to operate for 25+ years producing ~65,000 tonnes of copper-inconcentrate per annum (~71,000tpa in the first five years) with precious metals and ~900 tonnes of
molybdenum-in-concentrate per annum. Concentrate is planned to be transported, by truck, using
existing sealed roads to Bunbury or Geraldton Port for export.
Discovered in the mid-2000’s in a previously unexplored part of the South-West Yilgarn Terrane,
Caravel’s copper deposits form part of a 30km long regional porphyry-style copper-molybdenum-gold
and silver mineralised belt. This region also hosts some of Australia’s most significant mineral
discoveries including the world-class Greenbushes lithium deposit, Boddington gold-copper deposit
and Chalice Julimar PGE-nickel-copper deposit (Figure 2).
Figure 2. Southwest Yilgarn Terrane with major mines, mineral discoveries and interpreted regional
geological features and boundaries.
ASX
CVV
5
2024 ANNUAL REPORT
OPERATION'S REPORT
SECTION 02
UPDATED MINERAL RESOURCE ESTIMATE
Caravel reported an updated Mineral Resource Estimate (MRE) for the Caravel Project in November
2023, incorporating results from in-fill and resource definition drilling completed at the Bindi and
Dasher deposits since the previous MRE announced on 23 November 2021.
The updated Mineral Resource totals 1.276 billion tonnes @ 0.24% Cu, 47ppm Mo, 22ppb Au and
1.1ppm Ag for 3,032,500t of contained copper, 60,600t of contained molybdenum, 895,100oz of
contained gold and 46.3Moz of contained silver (0.1% Cu cut-off – see Tables 1 and 2).
Since the last Mineral Resource update, approximately 6,400 metres of diamond drilling (DD) was
completed to obtain metallurgical sample and geotechnical information and 9,300 metres of Reverse
Circulation (RC) in-fill drilling was completed at Bindi and Dasher, predominantly focused on the
planned starter pits to improve confidence in the early mining schedule.
This drilling has underpinned significantly higher confidence for the Measured Resource category,
which has increased by 48% to 155Mt (up from 105Mt in November 2021) (Figure 3).
Table 1: Caravel Copper Project1 November 2023 Cu and Mo Mineral Resource (0.1% Cu cut-off grade)
Measured
Indicated
Inferred
TOTAL
Tonnes
(Mt)
155
544
578
1,276
Note – appropriate rounding applied
1
Cu
(%)
0.26
0.24
0.23
0.24
Mo
(ppm)
64
46
44
47
Contained
Cu (t)
405,600
1,301,500
1,325,400
3,032,500
Contained
Mo (t)
9,950
24,950
25,700
60,600
Caravel Copper Project combines Bindi, Dasher, and Opie deposits
Precious Metals Estimation and Growth
As well as increasing confidence in the copper and molybdenum within the Resource, the updated
MRE has also provided the first detailed assessment of precious metals within the Project’s orebodies,
estimating 895,100oz of contained gold and 46.3Moz of contained silver.
Due to pre-2019 holes being selectively assayed for precious metals, not all drill samples have
comprehensive assay suites, and hence the classification for gold and silver remains as Indicated and
Inferred.
Table 2: Caravel Copper Project1 November 2023 Au and Ag Mineral Resource (0.1% Cu cut-off grade)
Measured
Indicated
Inferred
TOTAL
Tonnes
(Mt)
681
574
1,255
Note – appropriate rounding applied
1
Au
(ppb)
23
21
22
Ag
(ppm)
1.2
1.0
1.1
Contained
Au (oz)
503,300
391,800
895,100
Contained
Ag (Moz)
27.1
19.2
46.3
Caravel Copper Project Au & Ag resource combines Bindi, Dasher but excludes Opie
Recent metallurgical testwork shows an increase in precious metal recoveries, ranging between 5060% for both gold and silver, up from a previous estimate of 30%. This will have a material impact on
revenues assessed from precious metals credits. The precious metals are recovered to the copper
concentrate and the additional revenue from higher recoveries is obtained with no change to
production costs.
ASX
CVV
6
CARAVE L
caravelminerals.com.au
Importantly, with future drilling into multiple areas of the orebody that remain open, the Company
sees strong potential to continue growing the Mineral Resource base at the Caravel Copper Project.
Given the Project’s already long mine life, deeper holes that had been planned to test for Resource
extensions at the Bindi Lower Limb and Far East positions earlier this year were deferred.
The new Mineral Resource therefore does not include possible extensions to the mineralisation within
this area.
Full details of the 2023 Mineral Resource Estimate were provided in the Company’s ASX
Announcement dated 13 November 2023.
Figure 3. Mineral Resource tonnage and classification growth 2016 – 2023.
FEASIBILITY STUDY PROGRESS
Approvals
The Company achieved a significant milestone in the permitting process after finalising the Project’s
Environmental Review Document (ERD) and submitting to the Environmental Protection Agency (EPA)
of Western Australia for assessment.
The lodgement follows four years of extensive fieldwork, investigations, studies and scientific
modelling, resulting in a comprehensive document detailing Project impacts in the context of the
cultivated farming environment of the Western Australian Wheatbelt region.
The ERD outlines the Project development on mostly cleared, freehold land, and includes:
•
•
•
ASX
CVV
7
Mine pits, waste rock landforms, ore processing, and tailings;
Site infrastructure such as workshops, laydown areas, landfill, communications, offices, fuel
storage, accommodation; and
Supporting infrastructure including a water borefield and sub-surface pipeline and a connection to
the State electrical grid.
2024 ANNUAL REPORT
OPERATION'S REPORT
SECTION 02
The Environmental Review is the most detailed level of environmental assessment available under
State and Federal legislation. The Project’s ERD outlines how the future operation can be delivered
responsibly while meeting the requirements of the EPA.
Detailed studies have been undertaken for:
•
•
•
•
•
•
Flora and vegetation;
Fauna, including vertebrates, endemic fauna, and subterranean fauna;
Inland waters, including groundwater and surface water;
Terrestrial environmental quality, including soils and waste characterisation;
Social surrounds, including heritage, dust, and noise; and
Air quality, including greenhouse gas and other air emissions.
Most of the Project will be developed on cleared farmland, with areas of interspersed remnant
vegetation which ranges from degraded or salt-affected regrowth to pockets of good quality
vegetation. The design of the Project has successfully ensured that the majority of high-value remnant
native vegetation is preserved and potentially enhanced.
The Project will draw electrical power from the State electrical grid that is connected to considerable
renewable energy generation. This will reduce emissions for the Caravel operations and support
marketing of a low carbon intensity copper product.
The 25+ year life of the Project provides a unique opportunity to form partnerships to pursue social and
environmental objectives, with a priority on replanting extensive areas of degraded land to re-establish
flora and fauna connectivity at a regional scale.
Figure 4. Drone image looking east over Bindi pit (Bindi Hinge and Bindi East) areas.
Groundwater Licencing
Caravel has applied for water licences under section 5C Rights in Water and Irrigation Act 1914 and
has completed groundwater investigations in accordance with Department of Water and
ASX
CVV
8
CARAVE L
caravelminerals.com.au
Environmental Regulation (DWER) guidance. The numerical groundwater model and H3 report were
finalised and submitted in June 2024.
Caravel completed fieldwork for a regional water census in the vicinity of the proposed borefield to
identify groundwater features, including licenced and unlicenced bores and soaks, regional
environmental features and other surface water features such as surface-fed dams.
Samples were collected according to a DWER approved methodology, with chemical and other
analysis completed to establish baseline information for the regional context of the borefield. This will
contribute to a management framework and form the basis of ongoing liaison with landowners. The
census information will also inform the EP Act 1986 Part IV environmental assessment to be detailed
in the Environmental Review Document.
Mining
Following the delivery of an updated Mineral Resource Estimate in November 2023 (see ASX
Announcement – 13 November 2023), which incorporated molybdenum and precious metals, Caravel
initiated a revised mine plan to support the Feasibility Study. The updated mine plan reassesses the
Bindi and Dasher pit shell shapes and locations, bench heights, internal road design, ROM pad size
and location, optimal fleet selection and scheduling of ore delivery to the process plant. The final
mine plan is nearing completion for late 2024.
ASX
CVV
9
Discussions have progressed with mining equipment manufacturers as Caravel works towards
identification of suppliers of an automated and electrified mining fleet. Fleet financing proposals from
2024 ANNUAL REPORT
OPERATION'S REPORT
SECTION 02
two suppliers’ vendors have been received as progress is made towards preliminary commercial
arrangements.
Metallurgy
Testwork for the flotation circuit during the year confirmed previously announced targets for copper
concentrate grades and recoveries, including molybdenum. Precious metal recoveries were also
tested, showing a range of 50% to 60% recovery of gold and silver to the copper concentrate.
Further testwork is continuing aimed at further process design simplification, production of a
marketable concentrate sample and detailed elemental specification, and optimisation of equipment
selection and sizing. A key focus is the primary grind size, which is the major energy consumer in the
flowsheet, and how the copper flotation responds to a coarser grind size. Final flotation circuit testing
is focused on reducing both capital and operating costs in a simplified flowsheet.
Work is nearing completion for reporting late 2024.
Power
Caravel has submitted a 125MW application to Western Power and is participating in the pilot of the
newly created Major Customer Connection Process (MCCP) Review Program.
Caravel has a high level of confidence in securing the access offer in 2025, at which time key access
offer terms can be negotiated. It is anticipated that power will be supplied by third parties to the
Project via a combined renewable energy and gas power mix, should the announced closure of
currently operating coal fired power stations by 2030 occur.
Caravel has commenced discussions with large private sector power generators in WA including
renewable power generators.
During the year, the WA Government announced the Clean Energy Link – North Region Transmission
Upgrades and introduced a new ‘Critical Projects Framework’ that builds on the ‘MCCP’. Projects
assessed as ‘critical’ will be fast-tracked for connection. Caravel remains in discussions Western
Power under this new fast-track framework.
Drilling
Exploration drilling results were reported during the reporting period from eight diamond drill holes
completed in mid-2023 at the Bindi and Dasher deposits, with the results adding further confidence to
the Bindi and Dasher Resource models.
Full details of the drilling and assay results were provided in the Company’s ASX Announcement dated
10 October 2023.
A small diamond core geotechnical drill programme was completed during the September 2023
Quarter, with results used for open pit mine design, general arrangement of the process plant and
supporting non-process infrastructure, and to collect samples for continuous metallurgical testing for
engineering design.
ASX
CVV
10
CARAVE L
caravelminerals.com.au
CORPORATE
Safety
Caravel continues to implement its Health, Safety, Environment, Community and Quality Management
System. The focus to date has been on identifying risks in our field operations (exploration and
investigative works) and implementing preventative controls to minimise the likelihood of incidents
and implementing mitigating controls.
Heritage
Caravel met with the newly formed Yued Corporation Board in Moora early in the reporting period,
introducing the Company and Project and gaining an understanding of the Yued Corporation’s function
and scope and its approach to heritage management.
Following site surveys conducted in February 2024, a heritage survey report for the borefield and
pipeline was finalised. Further discussions with the Yued Corporation and the Cultural Advisory
Committee on cultural matters and final approvals required are ongoing, including investigation of
partnership opportunities that may result from the mine’s development.
Stakeholder Engagement
Caravel continued its engagement program with a wide range of stakeholders throughout the reporting
period. Surrounding the proposed borefield, detailed communication and property visits were
undertaken as part of water feature fieldwork and sampling. This work was made possible by
landowners who facilitated field visits and shared information on water resources. The resulting data
and analyses have been shared with property owners and used to further calibrate the groundwater
models (H3 Report) submitted to the regulator. There were no lost time injuries during FY2024.
Appointment of Strategic Advisor
In March 2024, Caravel appointed experienced mining executive Greg Lilleyman as a Strategic Advisor
to the Board.
Mr Lilleyman has over 30 years’ international experience in the mining sector, encompassing multiple
commodities and including large-scale project development and construction, operational and
business leadership, joint venture management and technology deployment.
Throughout his career, Mr Lilleyman has played a pioneering role in the development and
implementation of next-generation technologies within the mining industry, including the
implementation of remote operating centres and autonomous haulage at Rio Tinto.
His strong technical knowledge and experience is expected to be highly valuable to Caravel as the
Company prepares to transition from exploration into development and operations, with Mr Lilleyman
bringing proven mining and technology expertise and extensive experience in identifying and securing
project funding solutions.
Capital Raising
Caravel completed a successful $10 million capital raising in August 2023, comprising an institutional
share placement and a Share Purchase Plan (SPP) at an offer price of $0.22 per New Share.
ASX
CVV
11
The Shares offered under the Placement and the SPP entitled participants to one free attaching option
for every two New Shares subscribed exercisable at $0.33 per share and expiring two years from the
date of issue.
2024 ANNUAL REPORT
CORPORATE UPDATE
SECTION 03
The Options are listed on the ASX under the code CVVOB.
Letter of Interest from EIFO
During the reporting period, Caravel received a Letter of Interest (LOI) from the Export and Investment
Fund of Denmark (EIFO), the Danish Export Credit Agency (ECA), confirming their interest in providing
equipment finance and potential project finance for the Caravel Project.
The Letter of Interest from EIFO is an important step in the strategic partnering and financing process
for the Project which is being progressed as part of the Caravel Project Bankable Feasibility Study
(BFS). EIFO issues guarantees to cover loans or other debt instruments in conjunction with
agreements to procure equipment from Danish exporters such as FLSmidth (FLS). An EIFO guarantee
is backed by the Danish State and, as such, is a AAA-rated guarantee.
EIFO has extensive experience working with FLSmidth, which is a leading Denmark-based global
equipment and technology supplier. EIFO has cooperated with FLSmidth for many years in the
financing of projects around the world, gaining extensive experience within the field of export
equipment and project finance.
Caravel has worked with FLSmidth throughout 2023 to identify key process equipment packages
required for the Caravel Copper Project. FLSmidth is a global supplier of full flowsheet technologies.
Similar financing options are being discussed with potential strategic partners in relation to mining
fleet, which together with the process plant equipment represents most of the total requirement for
the Project.
EIFO indicated in the Letter of Interest that, if the Project has a sufficient level of Danish economic
content, it can potentially contribute a significant part of the senior project financing component
(subject to further assessments).
The Letter of Interest from EIFO and ongoing discussions is part of engagement with potential industry
partners to finance the Caravel Copper Project.
Strategic Investor and Partner Engagement
Caravel continued to engage with potential investors who have a shared interest in the development
of the Caravel Copper Project, including groups with expertise and capability in financing, mining
operations, mining fleet and process plant equipment, and export credit agencies.
YEAR AHEAD
The Caravel Copper Project is on a clear pathway to deve