Developing Australia’s Next Copper Project
1
June 2026
RIU Gold Coast
2
This presentation should be considered in its entirety. If you do not understand
the material contained in this presentation, you should consult your professional
advisers.
The sole purpose of this presentation is to provide shareholders with an update
on current activities of the Company and the Caravel Copper Project. Any
statements which may be considered forward looking statements relate only to
the date of this presentation document. Such forward looking statements involve
known and unknown risks, uncertainties and other important factors beyond the
Company’s control that could cause actual results, performance or achievements
of the Company to be materially different from future results, performance, or
achievements expressed or implied by such forward looking statements. As a
result of these factors, the events described in the forward-looking statements in
this document may not occur.
Notwithstanding the material in this presentation, shareholders should consider
that any investment in the Company is highly speculative and should consult their
professional advisers – whether scientific, business, financial or legal – before
deciding whether to make any investment in the Company. The Company may at
its absolute discretion, but without being under any obligation to do so, update,
amend or supplement this presentation or any other information to the recipient.
No person has been authorised to give any information or make any
representation other than contained in this document and if given or made, such
information or representation must not be relied on as having been so
authorised.
Competent Persons Statements
The information in this report that relates to Exploration Results has been
extracted from the Previous Disclosure listed below. These announcements are
available to view on the Company’s website at www.caravelminerals.com.au. The
Company confirms it is not aware of any new information or data that materially
affects the information included in these announcements and that all material
assumptions continue to apply and have not materially changed.
The information in this announcement that relates to Mineral Resources has been
extracted from the announcement released to ASX on 13 November 2023 titled
“2023 Mineral Resource Update - Caravel Copper Project”. This announcement is
available to view on the Company’s website at www.caravelminerals.com.au. The
Company confirms it is not aware of any new information or data that materially
affects the information included in the previous announcement and that all
material assumptions and technical parameters underpinning the estimates in
the previous announcement continue to apply and have not materially changed.
The Statement of Estimates of Ore Reserves for the Caravel Copper Project was
reported by the Company in accordance with ASX Listing Rule 5.9 in the
announcement released to the ASX on 12 July 2022 titled “Caravel Copper
Project Pre-Feasibility Study Highlights Robust, Executable Project and Reports
Maiden Ore Reserve. The Company confirms it is not aware of any new
information or data that materially affects the information included in the
previous announcement and that all material assumptions and technical
parameters underpinning the estimates in the previous announcements continue
to apply and have not materially changed.
Previous Disclosure
This document may include references to information that relates to Mineral
Resources prepared and first disclosed under the JORC Code 2012. The
information references the Company’s previous ASX announcements
• 12 July 2022 “Caravel Copper Project Pre-Feasibility Study
Highlights Robust, Executable Project and Reports Maiden
Ore Reserve”
• 20 September 2022 “Pre-Feasibility Study Update – Caravel
Copper Project”
• 13 April 2023 “PFS Processing Update – Caravel Copper
Project”
• 10 October 2023 "Drilling Results - Dasher and Bindi"
• 13 November 2023 "2023 Mineral Resource Update - Caravel
Copper Project“
• 22 October 2024 “Key Water Agreement Signed – Caravel
Copper Project”
• 23 April 2025 “Simplified Process Design Yields High-Grade
Cu, Mo and PMs”
• 4 November 2025 "Strategic Mine Plan Update"
• 14 November 2025 "Strategic Mine Plan Update – Retraction"
• 23 December 2025 "Definitive Feasibility Study Update"
These announcements are available to view on the Company’s website
www.caravelminerals.com.au. The Company confirms that it is not aware of any
new information or data that materially affects the information included in the
original market announcement and that all material assumptions and technical
parameters underpinning the relevant market announcement continue to apply
and have not materially changed. The Company confirms that the form and
context in which the Competent Person’s findings are represented have not been
materially modified from the original market announcement.
Forward Looking Statements
This document may include forward looking statements. Forward looking
statements include, but are not necessarily limited to, statements concerning
Caravel Minerals planned exploration programmes, studies and other statements
that are not historic facts. When used in this document, the words such as
“could”, “indicates”, “plan”, “estimate”, “expect”, “intend”, “may”, “potential”,
“should” and similar expressions are forward looking statements. Such
statements involve risks and uncertainties, and no assurances can be provided
that actual results or work completed will be consistent with these forward-
looking statements.
Authorisation of release
Release of this market announcement is authorised by Don Hyma, Caravel
Minerals Limited’s Managing Director.
Forward Looking and Cautionary Statements
Caravel Minerals Limited (Caravel or the Company)
The past 24 months have de-risked the Caravel Copper Project
Methodically progressing to a Definitive Feasibility Study
C A R A V E L M I N E R A L S | A S X : C V V
3
APPROVALS & ENVIRONMENT
✓ Mining license granted
✓ Grid connection from Western
Power
✓ Environmental Review Document
submitted to the EPA
TECHNICAL DE-RISKING
✓ Mine plan updated and ore
reserve verified
✓ Process testwork completed and
flowsheet simplified
✓ Engineering designs complete
CORPORATE & COMMERCIAL
✓ Land agreements signed
✓
✓ DFS funding
MOU signed with Adani
MAJOR SHAREHOLDERS
CVV Corporate Snapshot
4
C A R A V E L M I N E R A L S | A S X : C V V
A$151m
MARKET CAP
A$0.27
SHARE PRICE
~559 m
SHARES ON ISSUE
A$9.5 m
CASH (31 MAR 2026)
Paradice,
8.6% Glenvar,
3.5%
Board &
Management,
10.0%
Balance of
Top 20,
20.5%
Other
shareholders,
57.4%
Source: IRESS as at 25 May 2026
SHARE PRICE · LAST 12 MONTHS
-
1.0
2.0
3.0
4.0
5.0
6.0
$-
$0.10
$0.20
$0.30
$0.40
$0.50
$0.60
May-25 Jul-25 Sep-25 Nov-25 Jan-26 Mar-26
Volume
Traded
(M)
Share
Price
(A$)
Extensive Mining & Project Development Capabilities
Highly experienced Board, leadership and management team with a track record of delivering shareholder value
5
C A R A V E L M I N E R A L S | A S X : C V V
BOARD & LEADERSHIP
MANAGEMENT TEAM
Wayne Trumble
Non-Executive Chairman
Don Hyma
Managing Director
Alasdair Cooke
Executive Director
Richard Monti
Non-Executive Director
Greg Lilleyman
Strategic Board Advisor
Dan Davis
CFO & Company Secretary
Andy O’Dowd
GM Mining
Bruce McLarty
GM Commercial
Greg MacDonald
Study Manager
Grant Harding
Consulting Metallurgist
Peter Pring
Exploration Manager
Chantal Hartstone
Corporate Affairs Manager
Caravel Copper Project
Australia’s largest undeveloped copper deposit and the
fourth-largest copper discovery worldwide in the last 14-years
6
3.03 Mt
1,277 Mt @ 0.24% Cu plus Mo, Au, Ag
C O N T A I N E D C O P P E R ( R E S O U R C E )
1.42 Mt
C O N T AI N E D C O P P E R ( R E S E R V E )
30 km
M I N E R AL I S E D T R E N D
150 km
F R O M P E R T H , W A
583Mt @ 0.24%Cu plus Mo, Ag, Ag
65ktpa Cu production
C O P P E R C O N C E N T R AT E
C A R A V E L M I N E R A L S | A S X : C V V
Native Title
S T AT E S E T T L E M E N T I N 2 0 2 1
25+ year mine life
U P S I D E T H R O U G H D R I L L I N G
Rank Project Company Country DFS Status
1st
El Arco SCC Mexico 2022
2nd
Frieda River PanAust PNG 2018
3rd
Cascabel SolGold/Jiangxi Ecuador In progress
4th
Baimskaya Trianon Russia 2021
5th
Warintza Solaris Ecuador In progress
6th
Cañariaco Norte Alta Copper Peru In progress
7th
Mara Glencore Argentina In progress
8th
Copper World Hudbay USA In progress
9th
Josemaria BHP/Lundin Argentina 2020
10th
Caravel Caravel Minerals Australia In progress
11th
Kingking St Augustine Philippines In progress
12th
Eva Harmony Australia 2025
13th
Santa Cruz Ivanhoe USA 2025
14th
Morrison Pacific Booker Canada 2009
17.7
12.6
12.4
9.9
9.0
6.5
6.1
5.9
4.6
3.0
2.9
1.9
1.5
1.0
7
Globally Significant Resource
Caravel sits comfortably as a globally significant resource amongst feasibility-stage peers
C A R A V E L M I N E R A L S | A S X : C V V
Caravel
Tier-1 Jurisdiction
Source: Global Cu projects database (April 2026). Filter: Feasibility Started / Complete, 1 Mt+ Contained Cu, 0.20-0.75% Cu resource grade
8
Globally Significant Mine Life
Initial 25+ year life of mine will be the 6th largest globally amongst undeveloped copper projects
C A R A V E L M I N E R A L S | A S X : C V V
32 Years
30 Years
29 Years
27 Years
26 Years
25 Years
24 Years
23 Years
23 Years
20 Years
19 Years
13 Years
13 Years
Rank Project Company Country Study
1st
Copper Creek Faraday Copper USA 2023 PEA
2nd
Berg Surge Copper Canada 2023 PEA
3rd
North Island North Isle Canada 2025 PEA
4th
Casino Western Copper Canada 2022 DFS
5th
Vizcachitas Los Andes Copper Chile 2023 PFS
6th
Caravel Caravel Minerals Australia 2023 PFS
7th
Santo Tomas Oroco Resource Mexico 2024 PEA
8th
Santa Cruz Ivanhoe Electric USA 2025 PFS
9th
Haib Koryx Copper Namibia 2025 PEA
10th
Warintza Solaris Resources Ecuador 2025 PFS
11th
Josemaria BHP/Lundin Argentina 2020 DFS
12th
Arctic Trilogy Metals USA 2023 DFS
13th
Marimaca Marimaca Copper Chile
2025 DFS
Note: Mine Life (Years) based on each project's latest technical study
9
Resource – Simple Geology & Large-Scale
The Bindi deposit is a large open pit resource that remains open at depth
C A R A V E L M I N E R A L S | A S X : C V V
Measured &
Indicated
Inferred Total
Cu
Copper
1.70 Mt
0.24%
1.33 Mt
0.23%
3.03 Mt
0.24%
Au
Gold
0.50 Moz
0.02 g/t
0.39 Moz
0.02 g/t
0.89 Moz
0.02 g/t
Ag
Silver
27.1 Moz
1.24 g/t
19.2 Moz
1.04 g/t
46.3 Moz
1.15 g/t
Mo
Molybdenum
77 Mlbs
50 g/t
56 Mlbs
44 g/t
133 Mlbs
47 g/t
~700Mt in M&I
Measured 155Mt
Indicated 544Mt
Inferred 578Mt
Total 1,277Mt
Open at depth
Source: November 2023 Mineral Resource Update
Low cut-off grade enables simple bulk mining
Ultra-class mining fleet with large bench
heights lowers cost
Low strip ratio (~0.64:1) = low cost /lb
copper mined1
Autonomous operations and technology
offers a pathway to lower cost
2026 Bindi Mine Design
10
Mining - Conventional Bulk Mining
Delivers a low cost per lb through scale and cost efficiency
C A R A V E L M I N E R A L S | A S X : C V V
Waste Rock Formation
28 Year Bindi Pit Design
Tailings Storage
Note:
1 – First 5 yrs S/R 0.64:1, LOM S/R 1.38:1
583 Mt reserve sufficient for two decades of
mining
Conventional design
Lower construction risk
Standard process equipment
Understood by operating teams
Simplification and dual operating lines
Faster ramp-up & predictable performance
11
Processing - Proven, Simplified Flowsheet
De-risked to protect the principal revenue stream
1
C A R A V E L M I N E R A L S | A S X : C V V
2
3
2026 Caravel Process Plant Design
Admin, warehouse, workshop, fueling
Primary crusher and stockpile
Grinding and flotation plant
POWER
Access to 132kV grid power from a decarbonising WA State (SWIS) grid
WATER
Borefield ~60km west via pipeline uses non agricultural saline water for processing
PORTS
Shipping via existing bulk terminals at Bunbury and/or Geraldton
ROAD INFRASTRCUTURE
Access to existing State sealed roads for construction and operations
COMMUNICATIONS
Fibre connection support autonomous operations
Infrastructure & Logistics - in a Tier 1 Jurisdiction
Project favorably located close to existing world class infrastructure
12
WORLD-CLASS WORKFORCE
Highly experienced people across engineering, construction, operations, technology
C A R A V E L M I N E R A L S | A S X : C V V
13
Copper Market and M&A
14
The copper industry is transitioning
Grades are declining and discoveries are few
C A R A V E L M I N E R A L S | A S X : C V V
■ Steady, long-term decline: from 1.60% in 1990 to ~0.87% in 2022
■ Recent acceleration: mine grades now 0.55% and reserves at 0.40%.
■ Growing supply challenge ahead: miners must process more ore to deliver the
same copper output, creating the urgency for new supply.
■ Discovery rate has collapsed: despite exploration rising sharply
■ Diminishing returns on exploration: billions spent over 20+ years
■ M&A becomes the default strategy
Historic & Forecast – Global Average Grade of Mined Copper Copper Discoveries vs. Exploration Spend
Note: first presented September 2024, Gold Coast
Copper Has Re-Rated Structurally Higher
Consensus now sees prices above US$5.50/lb to 2030 - far above the 2024 view
Years of under investment and long project lead times mean supply struggles to respond to demand - the basis for the elevated long-term consensus
C A R A V E L M I N E R A L S | A S X : C V V
15
$0
$1
$2
$3
$4
$5
$6
$7
1990 1995 2000 2005 2010 2015 2020 2025 2030
2004 - 2015:
China urbanisation & industrialisation outpace
a decade of mine under-investment
GFC
2020s: demand led by renewables,
power grids & data centres
$5.50
Sources: Historical LME/COMEX (annual averages); Caravel Minerals / S&P Global (2024 base); updated June 2026 - J.P. Morgan, Goldman Sachs, S&P Global. Recent peak ~US$6.65/lb (COMEX, May 2026).
Stimulus Peak
Pre-2004: sub-US$1.50/lb
Copper Faces a Structural Supply Deficit
Demand to ~43 Mtpa by 2035 outpaces declining supply - only major new projects can close the gap
C A R A V E L M I N E R A L S | A S X : C V V
16
27.5
30.0
32.5
35.0
37.5
40.0
42.5
45.0
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
—— Primary demand
- - - Base case supply
—— Total potential supply (incl. risked/speculative projects)
▮ Growing structural deficit
~8 to 10Mtpa deficit by 2035
Major new projects required
Base case supply 33.5Mtpa
23.5Mtpa primary mine production + 4.5Mtpa
scrap/recycling + 5.5Mtpa new mine supply
Sources: Wood Mackenzie (Nov 2025), BHP (10 Mtpa additional supply by 2035), S&P Global (10 Mtpa shortfall by 2040). Current global primary mine production ~23-24 Mtpa.
Million
tonnes
per
annum
C A R A V E L M I N E R A L S | A S X : C V V
18
Pathway to Vertical Supply Chain
~67% of global smelting capacity is in China, India and Japan
TWO CLEAN CONCENTRATES
• A 20-22% Cu concentrate (1.3 g/t Au, 85 g/t Ag credits) with no impurities.
• A 52% Mo concentrate.
COPPER CONCENTRATE VERTICAL SUPPLY CHAIN OPPORTUNITY
• Negotiations advancing with Adani.
MOLY CONCENTRATE FEED TO EUROPEAN SPECIALTY STEEL PRODUCERS
• Financial proposal from Germany’s KwF.
Metal Production Total Payable Metal Annual Avg.
Copper 1,324,224 t 60,192 t
Silver 14,295,600 oz 649,800 oz
Gold 217,800 oz 9,900 oz
Molybdenum 22,440 t 1,020 t
CuEq* 1,571,433 t 71,429 t
*CuEq (t) = (Cu t × $12,122) + (Ag oz × $50) + (Au oz × $4,800) + (Mo t × $55,100) / $12,122
*Refer to slide 9 and appendix 1 for individual metal grades. Individual metal contributions should be considered for full understanding
Key Smelter Destinations
CHINA
~13 Mtpa smelter capacity
≈ half of global refined copper supply
INDIA
~1 Mtpa, scaling to ~1.5 Mtpa
Adani Kutch + Hindalco expansions
JAPAN
~1.5 Mtpa smelter capacity
Established premium concentrate market
Smelter capacity: ICSG / company reports (2024-25), approximate.
C A R A V E L M I N E R A L S | A S X : C V V
20
Significant value with leverage to copper price
Strong leverage to a rising copper price
Scenario PFS Base Case
Cu US$4.00/lb · Mo US$20/lb · Au US$1,700/oz · Ag US$18/oz
Copper Consensus Price
Cu US$5.50/lb
Free Cash Flow A$6.6 B A$13.0 B
Pre-tax NPV (7%) A$2.0 B A$4.7 B
Pre-tax IRR 21% 37%
Payback 4.9 yrs 2.4 yrs
Capex A$1,676 M A$1,676 M
C1 Cash Cost US$1.73/lb US$1.73/lb
AISC US$2.07/lb US$2.07/lb
Sensitivity: every US$0.50/lb on copper adds approximately A$0.9 B to pre-tax NPV
19
First Concentrate Production Aligned with Tight Copper Market
C A R A V E L M I N E R A L S | A S X : C V V
Key Milestones in the next 18 Months
Updated Ore Reserve Statement
Reserve update reflecting current resource model
DFS Publication
Definitive Feasibility Study published
Public environmental review
EPA public review process (target)
Part IV approval
Major environmental approvals (target)
Final Investment Decision (FID)
Project sanctioned — Funding & approvals in place
Q2 2026
Q3 2026
Q3 2026
Q2 2027
Q4 2027
2026 2027 2028 2030
2029 2031
Feasibility Study
Permitting
JV Partner
Engineering
Investment Decision
Construction
First Concentrate
Pathway to First Concentrate
Jan
25+ year mine life on a 1.28Bt
resource — generational asset
20
Key Takeaways of the Caravel Investment Case
The right commodity, the right place, the right time
C A R A V E L M I N E R A L S | A S X : C V V
Well-advanced with strong
government support
10Mt structural deficit by 2035
Supply-led pricing tailwind
Robust financials
150 km from Perth in WA, on private
freehold farmland, native title settled
by State of WA
Simple bulk open-pit, low strip ratio,
conventional process flowsheet
Updated Ore Reserve Q2 2026
DFS Q3 2026
FID Q4 2027
Long Life Resource
Permitting Tight Copper Market
Tier-1 Location
Proven Mining &
Processing
Advanced Studies
Thank you
21
FOR MORE INFORMATION ASX:CVV
caravelminerals.com.au
A P P E N D I X
Mineral Resource & Ore Reserve
Cu & Mo Mineral Resource
0.10% Cu cut-off grade · reported 13 November 2023
CLASS Mt Cu % Mo ppm Cu (t) Mo (t)
Measured 155 0.26 64 405,600 9,950
Indicated 544 0.24 46 1,301,500 24,950
Inferred 578 0.23 44 1,325,400 25,700
TOTAL 1,277 0.24 47 3,032,500 60,600
Au & Ag Mineral Resource
0.10% Cu cut-off · combines Bindi + Dasher (excludes Opie)
CLASS Mt Au ppm Ag ppm Au (oz) Ag (Moz)
Indicated 681 0.023 1.2 503,300 27.1
Inferred 574 0.021 1.0 391,800 19.2
TOTAL 1,255 0.022 1.1 895,100 46.3
Ore Reserve
0.10% Cu cut-off · based on Nov 2021 resource — update due Q2 2026
DEPOSIT CLASS Mt Cu % Cu (Mt)
Bindi Proven 105.4 0.27 0.28
Bindi Probable 369.6 0.23 0.84
Dasher Probable 108.4 0.27 0.29
TOTAL Proven +
Probable
583.4 0.24 1.42
Notes: Appropriate rounding applied. Bindi and Dasher Resource reported 13 Nov
2023; Opie Mineral Resource reported April 2016. Au & Ag Resource combines
Bindi and Dasher and excludes Opie. Refer to ASX announcements for full
Competent Person Statements.
C A R A V E L M I N E R A L S | A S X : C V V 25