Presentation - South-West Connect
Released
Released
Announcement PDF
Building Australia’s Next Copper Producer
South-West Connect Conference
28 October 2026
Don Hyma
Managing Director
Caravel Minerals Limited
ASX: CVV
2
This presentation should be considered in its entirety. If you do not understand the
material contained in this presentation, you should consult your professional advisers.
The sole purpose of this presentation is to provide shareholders with an update on
current activities of the Company and the Caravel Copper Project. Any statements
which may be considered forward looking statements relate only to the date of this
presentation document. Such forward looking statements involve known and unknown
risks, uncertainties and other important factors beyond the Company’s control that
could cause actual results, performance or achievements of the Company to be
materially different from future results, performance, or achievements expressed or
implied by such forward looking statements. As a result of these factors, the events
described in the forward-looking statements in this document may not occur.
Notwithstanding the material in this presentation, shareholders should consider that
any investment in the Company is highly speculative and should consult their
professional advisers – whether scientific, business, financial or legal – before
deciding whether to make any investment in the Company. The Company may at its
absolute discretion, but without being under any obligation to do so, update, amend or
supplement this presentation or any other information to the recipient.
No person has been authorised to give any information or make any representation
other than contained in this document and if given or made, such information or
representation must not be relied on as having been so authorised.
Competent Persons Statements
The information in this report that relates to Exploration Results has been extracted
from the Previous Disclosure listed below. These announcements are available to view
on the Company’s website at www.caravelminerals.com.au. The Company confirms it
is not aware of any new information or data that materially affects the information
included in these announcements and that all material assumptions continue to apply
and have not materially changed.
The information in this announcement that relates to Mineral Resources has been
extracted from the announcement released to ASX on 13 November 2023 titled “2023
Mineral Resource Update - Caravel Copper Project”. This announcement is available to
view on the Company’s website at www.caravelminerals.com.au. The Company
confirms it is not aware of any new information or data that materially affects the
information included in the previous announcement and that all material assumptions
and technical parameters underpinning the estimates in the previous announcement
continue to apply and have not materially changed.
The Statement of Estimates of Ore Reserves for the Caravel Copper Project was
reported by the Company in accordance with ASX Listing Rule 5.9 in the announcement
released to the ASX on 19 June 2026 titled "Updated Ore Reserve - Caravel Copper
Project". The Company confirms it is not aware of any new information or data that
materially affects the information included in the previous announcement and that all
material assumptions and technical parameters underpinning the estimates in the
previous announcement continue to apply and have not materially changed.
Previous Disclosure
This document may include references to information that relates to Mineral
Resources prepared and first disclosed under the JORC Code 2012. The information
references the Company’s previous ASX announcements
• 12 July 2022 "Caravel Copper Project Pre-Feasibility Study Highlights Robust,
Executable Project and Reports Maiden Ore Reserve"
• 20 September 2022 "Pre-Feasibility Study Update – Caravel Copper Project"
• 13 April 2023 "PFS Processing Update – Caravel Copper Project"
• 10 October 2023 "Drilling Results - Dasher and Bindi"
• 13 November 2023 "2023 Mineral Resource Update - Caravel Copper Project"
• 1 May 2024 "Significant Permitting Milestone Achieved, Environmental Review
Document Lodged - Caravel Copper Project"
• 22 October 2024 "Key Water Agreement Signed – Caravel Copper Project"
• 23 April 2025 "Simplified Process Design Yields High-Grade Cu, Mo and PMs"
• 2 October 2025 “Caravel Secures Preliminary Grid Connection Access Offer From
Western Power”
• 6 November 2025 “Caravel Minerals Sign MOU with Adani”
• 19 February 2026 "Project Finance Update"
• 25 February 2026 "Project Update - Caravel Copper Project"
• 2 April 2026 "Definitive Feasibility Study Update"
• 15 June 2026 "$15 Million Royalty Funding Arrangement"
• 19 June 2026 "Updated Ore Reserve - Caravel Copper Project"
• 17 July 2026 "Definitive Feasibility Study - Mining"
• 13 August 2026 "Project Update - Caravel Copper Project"
• 14 September 2026 "Gillingarra Borefield Drilling and Testing Programme
Completed"
• 18 September 2026 "DFS Revised Completion Timing"
• 21 September 2026 "Mining Services MOU with Thiess"
These announcements are available to view on the Company’s website
www.caravelminerals.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the original
market announcement and that all material assumptions and technical parameters
underpinning the relevant market announcement continue to apply and have not
materially changed. The Company confirms that the form and context in which the
Competent Person’s findings are represented have not been materially modified from
the original market announcement.
Forward Looking Statements
This document may include forward looking statements. Forward looking statements
include, but are not necessarily limited to, statements concerning Caravel Minerals
planned exploration programmes, studies and other statements that are not historic
facts. When used in this document, the words such as “could”, “indicates”, “plan”,
“estimate”, “expect”, “intend”, “may”, “potential”, “should” and similar expressions are
forward looking statements. Such statements involve risks and uncertainties, and no
assurances can be provided that actual results or work completed will be consistent
with these forward-looking statements.
Production targets and forecast financial information
The production target and forecast financial information in this presentation are from
the Pre-Feasibility Study (12 July 2022), the PFS Update (20 September 2022) and the
PFS Processing Update (13 April 2023). They assume a 25+ year Project life based on
Proved and Probable Ore Reserves (81.6%) and Inferred Mineral Resources (18.4%).
There is a lower level of geological confidence associated with Inferred Mineral
Resources, and there is no certainty that further exploration work will result in the
delineation of higher-level Resources or Reserves or add to the economics of the
Project. Funding in the order of A$1.5 billion was estimated to be required to achieve
the outcomes indicated. The Company confirms that all material assumptions
underpinning the production target and forecast financial information derived from it,
as set out in those announcements, continue to apply and have not materially changed.
The Definitive Feasibility Study, targeted for release in Q4 2026, will supersede these
figures.
Authorisation of release
Release of this presentation is authorised by Don Hyma, Caravel Minerals Limited’s
Managing Director.
Forward Looking and Cautionary Statements
Caravel Minerals Limited (Caravel or the Company)
Caravel Copper Project
One of Australia’s largest undeveloped copper deposits
3
Location:
150 km north-east of Perth, in the Wheatbelt
Freehold farmland, native title settled
Sealed roads, grid power and a local workforce
30 km mineralised trend, open at depth
3.03 Mt
1,277 Mt @ 0.24% Cu plus Mo, Au, Ag
C O N T A I N E D C O P P E R ( R E S O U R C E )
1.42 Mt
C O N T AI N E D C O P P E R ( R E S E R V E )
597 Mt @ 0.24% Cu plus Mo, Au, Ag
Rank Project Company Country DFS Status
1st
El Arco SCC Mexico 2022
2nd
Frieda River PanAust PNG 2018
3rd
Cascabel SolGold/Jiangxi Ecuador In progress
4th
Baimskaya Trianon Russia 2021
5th
Warintza Solaris Ecuador In progress
6th
Cañariaco Norte Alta Copper Peru In progress
7th
Mara Glencore Argentina In progress
8th
Copper World Hudbay USA In progress
9th
Josemaria BHP/Lundin Argentina 2020
10th
Caravel Caravel Minerals Australia In progress
11th
Kingking St Augustine Philippines In progress
12th
Eva Harmony Australia 2025
13th
Santa Cruz Ivanhoe USA 2025
14th
Morrison Pacific Booker Canada 2009
17.7
12.6
12.4
9.9
9.0
6.5
6.1
5.9
4.6
3.0
2.9
1.9
1.5
1.0
4
Globally Significant Resource
A top-ten feasibility-stage copper resource worldwide, and the only one in Australia
C A R A V E L M I N E R A L S | A S X : C V V
Caravel
Tier-1 Jurisdiction
Source: Global Cu projects database (April 2026). Filter: Feasibility Started / Complete, 1 Mt+ Contained Cu, 0.20-0.75% Cu resource grade
Large open pit with a low strip ratio
Big trucks and shovels keep unit costs down
30 Mtpa plant using standard equipment
Clean copper concentrate with gold and
silver credits
2026 Bindi Mine Design
5
Proven Methods, at Scale
Open-pit mining and flotation, the same approach used across Western Australia
C A R A V E L M I N E R A L S | A S X : C V V
597 Mt Ore Reserve, 27 year mine life
Mining services MOU signed with Thiess
2026 Process Plant Design
POWER
Connection to the State grid, 10 km from site
WATER
Saline borefield, not farm water
PORTS
Export through Bunbury or Geraldton
ROAD INFRASTRUCTURE
Sealed State roads to the gate
COMMUNICATIONS
Fibre in place for autonomous operations
Infrastructure Already in Place
Grid, water, roads, port, fibre and workforce, all within reach of Perth
6
WORLD-CLASS WORKFORCE
Within two hours of Perth
C A R A V E L M I N E R A L S | A S X : C V V
Copper Faces a Structural Supply Deficit
Demand is rising, mine supply is falling and few new deposits are being found
C A R A V E L M I N E R A L S | A S X : C V V
7
Global copper demand and mine supply capability to 2050, Mt Cu per
year
Major copper discoveries and exploration budgets, 1990 to 2025
Sources: Wood Mackenzie, Global Copper Strategic Planning Outlook, Q2 2026; S&P Global Market Intelligence, September 2026. Major discoveries are deposits containing at least 500,000 t of copper.
Smelters Are Short of Concentrate
Treatment charges have collapsed to zero, and below zero on the spot market
C A R A V E L M I N E R A L S | A S X : C V V
8
China annual benchmark treatment charge, 2020 to 2026, and the spot market in
October 2026, US$ per dry tonne
Smelters are paying to secure concentrate, not
being paid to treat it
Caravel’s clean concentrate, with gold and silver
credits, is what they want
Non-binding offtake MOU in place with Kutch
Copper (Adani), whose Indian smelter is operating
near full capacity
Sources: annual benchmarks, CRU and SMM (Antofagasta settlements with Chinese smelters); spot, S&P Global Platts CIF China clean concentrate treatment charge, 9 October 2026 (Fastmarkets index −US$272/t on the same
date).
What We Have Done Since the PFS
Four years of de-risking, completed to Definitive Feasibility Study standard
C A R A V E L M I N E R A L S | A S X : C V V 9
APPROVALS & ENVIRONMENT
✓ Mining lease granted
✓ Environmental Review Document
lodged with the EPA
✓ Water agreement signed and
borefield defined
TECHNICAL
✓ Mineral Resource updated: 3.03
Mt of copper
✓ Ore Reserve updated to 597 Mt,
Proved tonnes up 48%
✓ Flowsheet simplified and plant
sized at 30 Mtpa
CORPORATE & COMMERCIAL
✓ Land access agreements signed
✓
✓ DFS funding and lender letters of
interest secured
Offtake MOU with Kutch Copper
(Adani)
✓ Mining services MOU with Thiess
✓ Grid connection access offer
from Western Power
✓ Engineering and cost estimates
completed to DFS standard
Definitive Feasibility Study nearing completion. Financial results to be published this quarter.
Why Invest in Caravel?
10
3.03 Mt of copper, a 597 Mt Ore Reserve
and a 27 year mine life
Scale and Mine Life
Demand outpaces new mine supply through
the 2030s; a clean concentrate smelters
want
A Supply-Short Copper
Market
One of very few large Australian copper
developments on the ASX
Rare ASX Copper
Exposure
150 km from Perth on freehold farmland;
roads, grid and workforce already there
Close to Perth
Open-pit mining and flotation; scale and a
low strip ratio keep unit costs down
Proven, Low-Cost
Methods
DFS financial results this quarter
Environmental approval and final
investment decision to follow
Defined Path to
Production
C A R A V E L M I N E R A L S | A S X : C V V
11
Thank you
Come and see us at the Caravel booth for further discussion
For more information:
investors@caravelminerals.com.au
+61 8 9426 6400
https://caravelminerals.com.au/
Share your feedback